The loading plant is enabling dispatch on 3 rail tracks of 700 m length each. 2 transtainer bridges are used, each with 40 to carrying capacity.
Connection to the AlbatrosExpress and other block trains as Polzug a.o. on the terminal is realised.
Rail connection:
Quay site: UNK
Loading point: UCT or 74 or ZEUS