LZU

Leercontainer Zentrum Unikai GmbH

 Train

The loading plant is enabling dispatch on 3 rail tracks of 700 m length each.

2 transtainer bridges are used, each with 40 to carrying capacity.

Connection to the AlbatrosExpress and other block trains as Polzug a.o. on the terminal is realised.

Rail connection:
Quay site: UNK
Loading point: UCT or 74 or ZEUS

Company ::.

 

   
Connection ::.       .::Connection
Service ::.       .::Water
Links ::.       .::Street
Contact ::.        
Imprint ::.        
Customer-Login ::.        

Buchheisterstrasse
20457 Hamburg

Phone +49 40 319 92 681+49 40 319 92 681
Fax +49 40 319 34   81+49 40 319 34   81

info@lz-unikai.de
www.lz-unikai.de